Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | TJZJ |
Model Number : | Based on client's needs |
Payment Terms : | ,L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability : | Sufficient stock |
Delivery Time : | A week |
Steel truss floor slabs can be personalized in appearance design according to the designer's requirements, increasing the aesthetic appeal of the building
Steel truss floor slabs are gradually becoming the preferred material in the modern construction field due to their convenient construction and installation methods. This article will provide a detailed introduction to the construction preparation, installation steps, and precautions of steel truss floor slabs, showcasing the beauty of this modern building material in construction.
In the construction preparation stage, the first step is to clean and organize the construction site to ensure that the construction area is clean and orderly. At the same time, it is necessary to prepare the required materials and tools such as steel truss floor slabs, connectors, and fasteners according to the construction drawings and site conditions. In addition, it is necessary to provide training and safety education to construction personnel to ensure their safety and construction quality during the construction process.
In terms of installation steps, the installation of steel truss floor slabs mainly includes laying out and positioning, laying floor slabs, installing connectors, and fixing fasteners. Firstly, based on the construction drawings and site conditions, determine the laying position and elevation of the floor slab. Then, lay the prefabricated floor slab according to the layout position, and adjust its flatness and elevation. Next, use connectors to connect adjacent floor slabs, ensuring that the connection between the floor slabs is firm and reliable. Finally, use fasteners to secure the floor slab to structures such as beams and columns, ensuring that the floor slab does not experience displacement or deformation when subjected to loads.
In terms of precautions, the construction and installation of steel truss floor slabs need to pay attention to the following points. Firstly, strict adherence to construction standards and operating procedures is necessary during the construction process to ensure construction quality and safety. Secondly, the laying and connection of floor slabs need to be kept flat and vertical to avoid deviations and errors. In addition, attention should be paid to measures such as fire prevention, corrosion prevention, and waterproofing of floor slabs to ensure their service life and safety.
Place of Origin | Tianjin |
Brand Name | TJZJ |
Product Name | Truss deck |
Color | Black or Gray |
Width | As client's need |
Material | Steel |
Delivery Time | A week |
Zhongjian Technology (Tianjin) Co., Ltd. was founded in 2019 with a
registered capital of 8 million yuan. It is an intelligent
manufacturer of prefabricated building support plates,
headquartered in Panzhuang Industrial Park. The company mainly
produces prefabricated building steel bar PC frame bars, steel bar
truss floor support plates, Z] steel bar truss free formwork, Z]
prefabricated detachable steel bar truss formwork, steel bar
welding mesh, design, production and sales, and provides overall
solutions for steel bar processing. The company has introduced 8
sets of domestically advanced automated truss production lines,
selected raw materials from large state-owned steel mills, and has
a professional production and technical team.
The company adheres to the path of independent innovation with the
motto of "staying true to our original aspiration and keeping our
mission firmly in mind". After more than six years of development,
the company has grown from its infancy to its current thriving
state. In the future, the company will comprehensively promote
industrial development and upgrading, and build a national
technology leader in truss floor slabs.
![]() |